To run an Infrastructure Connectivity report
The Infrastructure Connectivity report displays a summary of connected infrastructure devices and access points.
To run an Infrastructure Connectivity report:
- In the Main Menu, click Reports.
- This will open the Reports page. Click Connectivity and Routing.
- This will open the Connectivity and Routing page. Click Infrastructure Connectivity.
- This will open the Infrastructure Connectivity Options page.
- If you want to reuse previously saved report values, select it in the Use saved values dropdown field.
- Specify the format of the report in the Report format field.
- Specify the View containing the device against which the report is to be run in the Please select a View dropdown field. From ENA v18.0 P06 upwards, you can drag Views into this field from the Drop Box.
- Specify the device against which the report is to be run in the Please select device dropdown field.
- ENA v17.0 P08 upwards: Specify the time zone to which you want the reporting period to apply. By default, this is set to None, which means that the time zone of the host/consolidation server is used.
- Click Save to save your report values, Run to run immediately, or click Cancel.
Comments
0 comments
Please sign in to leave a comment.